block signal removal on 7/QBL after CBTC

Recommended Posts

The L train had its legacy block signal removed after CBTC was installed. Most of the signal heads and trips were removed. I'll assume the shunted track blocks were also made much longer for reduced maintenance of the "AWS" (aux wayside signals). Documents show AWS is limited to 6 TPH on L. Is the Seltrac system on 7 going to get its legacy block signals removed the way the L got them removed? What about QBL Trainguard system, that supposedly is identical to L (but implementation spec for "mainline" CBTC instead of isolated L might be different)?

Share this post


Link to post
Share on other sites

The wayside signals will stay on the (7) as a backup in case CBTC fails. When CBTC fails on the (L) they can't run service from Broadway Junction to 8th Ave due to the lack of wayside signals.

Share this post


Link to post
Share on other sites
35 minutes ago, trainfan22 said:

When CBTC fails on the (L) they can't run service from Broadway Junction to 8th Ave due to the lack of wayside signals.

Wait, then what happens to the trains already between 8th avenue and Bway junction?

Edited by kosciusko

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  


×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.