Reliability (could save 3 to 4 buses), adds a subway connection, makes up for the Q74 which was eliminated but since the Q20B also hits Flushing, it shouldn't have as much ridership problems as the Q74, also Q20 ridership below Union is fairly light the Q20A and Q44 can handle the lost of the Q20B with little effect.