Jump to content

NX Express

Veteran Member
  • Posts

    6,673
  • Joined

  • Last visited

Everything posted by NX Express

  1. extensions further into Queens and a QBL Bypass are the only things I can think of at the moment.
  2. Yes, I read your previous post. If they're not evenly spaced, a train will have to wait at W4 Street. It's not like trains can't stop. And if trains can run at 30 tph ( ), they most likely can run at 30.5. And with the switches issue, it somehow works at Rogers Junction and in the Bronx! If even that is not possible, only one line needs to end service early, like the for example. The © can keep running until whenever.
  3. At 10PM frequencies: 7.5 tph © 5 6 6 6 So the math is that it ends up being 30.5 tph. Not bad. It could work for one stop.
  4. At late night headways, the together is 9 tph. That's nothing.
  5. How about this: No trains between Prospect Park and Brighton Beach. Southbound trains run via the from West 4th St to Coney Island, then via the to 36 Street. Northbound, in reverse. Trains extended via Coney Island to 59 Street station. No trains between Pacific Street and Stillwell Avenue. No trains between Parkside Avenue and Kings Highway. No trains between Pacific Street and 36 Street. passengers asked to use crosstown buses. customers advised to use trains via Stillwell Avenue.
  6. And what if they are affected ( tracks)? PS And what if no shuttle buses allowed?
  7. How about this: Structural collapse at Cortelyou Road ( and at Union Street . No trains can pass either station. Expected duration: one week. Practical suggestions please (e.g. no single-tracking for any significant distance, etc.)
  8. Isn't that a glorified version of the Downtown Connection?
  9. If by break down you mean frozen FINDs, then sure, they might break down more. If you mean broken-so-train-must-be-taken-OOS, then I doubt that R160s break down more than 32s.
  10. That outburst was an exception. Mostly, people curse, insult, etc. and the mods just ignore it.

  11. The bad thing on this forum is that the worst offenders (especially flaming and cursing) are long-time members, and the mods do NOTHING against them. :mad:

  12. I got sick of the bickering, text-sp3Ek, and cursing here.

  13. I made the smilie using iaza.com and the lock smilie here.

  14. Because people were not expected to board a train for one stop.
  15. This thread is an R179 Discussion, not R179 Foam Over Possible Manufacturers. Let's get back on a reasonable topic. Any updates on when the contract will be confirmed?
  16. Awesome! I was just going to ask about it.

  17. May I modify your signature pic (assuming it's made by you)?

  18. Can you please do something about this thread? Thanks!

  19. First let's get the M8s in service.:tup:
  20. The Second Avenue "Subway", whenever it opens, will be a grand total of four extra stops.
  21. Your signature picture is not showing.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.