Fan Railer Posted November 29, 2014 Share #1 Posted November 29, 2014 Bagged this lucky shot on an M7 the other day: Link to comment Share on other sites More sharing options...
peacemak3r Posted November 29, 2014 Share #2 Posted November 29, 2014 Very nice catch! Link to comment Share on other sites More sharing options...
nostalgia Posted November 30, 2014 Share #3 Posted November 30, 2014 Very interesting. At Harold, crossed over from Main Line #3 to Port Washington #1 to go through Line (tunnel) 4. Link to comment Share on other sites More sharing options...
m7zanr160s Posted December 1, 2014 Share #4 Posted December 1, 2014 Nice! Link to comment Share on other sites More sharing options...
CenSin Posted January 1, 2015 Share #5 Posted January 1, 2015 I see a lot of switches that end abruptly. Are those meant to derail trains going the other way? Link to comment Share on other sites More sharing options...
Fan Railer Posted January 24, 2015 Author Share #6 Posted January 24, 2015 I see a lot of switches that end abruptly. Are those meant to derail trains going the other way? There is a lot of switch work going on at Harold that is related to the ESA / HSR projects that are ongoing. Switches are getting removed / replaced / installed on a weekly basis. Link to comment Share on other sites More sharing options...
Union Tpke Posted January 27, 2015 Share #7 Posted January 27, 2015 Great video! Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.