  1. I still use a metro card because there is limited amount of omny vending machines near by,, one at junction Blvd but too lazy to go there, and I’m not willing to go to cvs or Walgreens to buy an omny card
  2. December 3 2023: More concrete slabs are being installed at 82nd street, it is half complete for now
  3. can anyone just press the switch button, for example switching a local to express at willets point, is it possible??? Or do train operators use a special tool for it?
  4. November 27 2023: The blue barricades have been removed in certain areas at 82nd street, which finally exposes the on going work, for 111 street, a small portion has been removed, this is mainly due to the newly installed platforms, 111 street didn’t receive any new platforms yet, since the contractor is using a different method to install them.
  5. As of today, November 25th 2023 New platforms are being installed at 82nd and 111 Street 69th Street has been receiving white painting on several steel structures, and light bulbs near the tracks, which indicates construction could begin soon New updates will be posted here
  6. In this thread, updates on the ongoing repairs that are happening on the line, there are several projects that will essentially improve the through the next upcoming years, everyone is welcomed to comment here if interested, especially if you are a causal line rider Finished projects: Flushing Main Street circulation improvements Grand Central 42nd Street stairs and structural repairs (3rd Avenue exit) On Going Projects: 82nd and 111 Street Renewal Escalator replacements 74th Street Broadway Woodside 61 Street track support structural repairs and repainting Grand Central 42nd Street Circulation improvements ADA Queensboro Plaza Future upcoming projects 69th 52nd 61st Street Station Renewal (Construction date 2024) 103rd Street Corona Plaza Station renewal (Construction Date 2025)
  7. It’s been completed like days ago, don’t know why the MTA decided to announce this today
  8. This is what I’ve predicted in the past, everyone called me crazy, saying that the and will both use 179 sets and it’ll basically impossible for the to only run 100% 179 sets, but here we are
  9. Does anyone know why the can’t run in 2 sections, especially tomorrow, where service can still be served between Manhattan and queens between 34th Steeet and Hunters point Avenue, if this pattern is possible during heavy snow storm conditions, then why isn’t it implemented as a GO service?
  10. They’ve been doing to every line, the 7th Avenue station on the had their Columbus painted in a blackish color, it honestly looks dope
  11. Elevator installation at Queensboro plaza, the station complex will be fully closed, it also affects the
  12. An addition to this, it seems like the contractors are already installing equipment on the Manhattan bound side at 69th street on the , if im not wrong, it could possibly mean 1 or 2 things 1. 69th Street Station Renewal: once the 82nd and 111 Street Manhattan bound platforms are completely rehabilitated, they’ll start closing the opposite side, at the same time closing the Manhattan bound platforms at 69th street, maybe 52nd street too I have no idea 2. Structural repairs/Overcoat painting: There is a contract, where the crews will do structural repairs, and paint sections that weren’t painted, which were part of a previous contract I want to stick with my first option, it’ll essentially complete the project much faster, and the whole Main St-74th St GO wouldn’t delay the project even further, I wonder what’s happening on the renovations, anyone got an update on that???
  13. The 74th Street-Main Street GO on the will start to happen more often next year, problem is that this will affect the 82nd and 111 Street Station renovation projects, it’s currently delayed already, it doesn’t need to be delayed again, my suggestion is to do this GO around approximately May-June 2024, when the 52nd and 69th street Manhattan bound platforms will be closed, so then the 74th-Main St GO will be worth it, no trains will pass on either direction, and there will be more time for construction to be done.
  14. Finally, all though the mta should’ve studied such features years before the 211’s entered service, it’s kinda too late to introduce such feature “Again”
  15. Pretty sure the trump administration was for the second Avenue subway, but the state was against any funds from him, not surprising at all, Andrew cromo is to blame in this case, either way the project would’ve taken years to be built
  16. there’s a video on YouTube showing a bunch of kids playing around with the lights on an R46, Normal passengers can’t even enjoy a peaceful ride
  17. Hunters point avenue and Avenue J reNEWvations have been completed
  18. Wow I doubt it’ll be finished in September 2032
  19. The R188’s display “FLUSHING EXP” as well, same with the local “FLUSHING LCL”
  20. New elevators will be built at the northern Blvd station on the Also at Queensboro plaza, the roof canopies have been removed to allow for elevator installation
  21. Oh that’s fine, all I know is that it’ll take 5 months to fix this issue, under MTA timeline
  22. Oh so that’s what the posters were for, they were preparing to officially introduce the first omny vending machines
  23. apparently there is posters where is states “Omny card machine is available at this station” or something like that, somehow the machines still don’t work, saw this video on YouTube btw
  24. So is the issue still on going or are the crews lazy to fix it, it’ll take 4 months
  25. If both sides are closed, the completion date for the project will be shorter, probably by end of 2024, people can just talk to 74th street, more transit options, if the Astoria line was rehabilitated in this manner why can’t the flushing line, or Jamaica?
×
×