From 1988-2001 If I recall correctly, the (N)(Q) Broadway South tracks were closed with the rerouting of the (Q) via 6 Avenue to 21 Street Queensbridge and recoloring the (Q) into(Q6Av) , then the (:P(D) North 6 Avenue Tracks were closed 2001-2004.

 

Correct. 1 minor correction. The (Q) ran to 57th/6th for about a year until the 21st./QueensBridge stations opened in late 1989.

 

 

From 1986-'88, the (:( and (D) had been split into '2 section. The Broadway line which they were later the (W)=(:) West End and the (Q)=(D)Brighton Lines. Thus the (N) became the Broadway/4th Ave Local for the rest of the project until

2004.

While the (M) was switched over to the West End where it remained until June 2009.

Link to comment
Share on other sites

Well here is the breakdown. First they closed the North Side of the Manhattan Bridge, and the yellow (:P, (D), along with the (N), and (Q) crossed the South Side. Then they closed the South Side of the Manhattan Bridge, and the (N) was redirected into the Montague Street Tunnel along with the (R). The train service that crossed the bridge at this time was the (:(, (D), (Q6Av). Then they closed the North Side of the Manhattan Bridge again. The (N) still used the Montague Street Tunnel, and the trains crossing the bridge at this time was the (W), (Q), <Q>. In the end all repairs were done, and it is in the same configuration (:), (D) ,(N), (Q) as before the Manhattan Bridge shut down.

Link to comment
Share on other sites

Well here is the breakdown. First they closed the North Side of the Manhattan Bridge, and the yellow (:P, (D), along with the (N), and (Q) crossed the South Side. Then they closed the South Side of the Manhattan Bridge, and the (N) was redirected into the Montague Street Tunnel along with the (R). The train service that crossed the bridge at this time was the (:(, (D), (Q6Av). Then they closed the North Side of the Manhattan Bridge again. The (N) still used the Montague Street Tunnel, and the trains crossing the bridge at this time was the (W), (Q), <Q>. In the end all repairs were done, and it is in the same configuration (:), (D) ,(N), (Q) as before the Manhattan Bridge shut down.

 

 

Not to be rude. I said the same thing above roadcrusier that was much more brief..:eek:

Link to comment
Share on other sites

Though I am getting worried that every time a train crosses the Manhattan Bridge the bridge is taking in more damage, because of the way the bridge was built with the train tracks on the side of the bridge. The bridge takes in a massive amount of damage every time the train crosses the bridge. The tracks are supposed to be located at the center of the bridge like on the Williamsburg Bridge.

Link to comment
Share on other sites

For a brief period in 1990, the (N) was once again rerouted via Bridge. So in essence, the (:P(D)(N)(Q6Av) ran together during that time via bridge.

 

I remember that. The City's DOT thought that the Broadway side of the tracks could handle about a year's worth of subway traffic until the next long term closure and work began again in mid-1991. However, just 3 months later they had to close it again for the next 11 years.

 

The (N) ran briefly from about Sept.-Dec. 1990 before not returning again on the Bridge(other than "G/O's)full time till 2004.

Link to comment
Share on other sites

I enjoyed reading that service change pamphlet; it made the (MTA) seem more in touch with its riders than the bureaucratic monopoly it has become today.

Yeah, the way they worded that pamphlet with phrases and words like "unfortunately" with regards to the (N) being made local and "for real" for how the subways were "coming back" was a nice touch and the descriptions of the service changes were informative. But the (MTA) was still the same bureaucratic monopoly then that it is now.

Link to comment
Share on other sites

If that was the case, where were the (B)(D) (Q6Av) sent in Manhattan/Brooklyn?

(B) - Shuttle between Pacific and Stillwell

 

(D) - 205th to 34th Street, same as 1986-88 and 2001-04

 

(Q6Av) - Replaced by (Q) which ran local in Brooklyn from Stillwell, via the Montague Tunnel, local from Whitehall to Canal and express from Canal to 57th Street. Used the Broadway connecting tracks north of 57th Street to get to 21st Street-Queensbridge.

 

Grand Street was served by a (S6) train to Broadway-Lafayette, same as 1986-88 and 2001-04.

Link to comment
Share on other sites

Correct. 1 minor correction. The (Q) ran to 57th/6th for about a year until the 21st./QueensBridge stations opened in late 1989.

 

 

From 1986-'88, the (B) and (D) had been split into '2 section. The Broadway line which they were later the (W)=(B) West End and the (Q)=(D)Brighton Lines. Thus the (N) became the Broadway/4th Ave Local for the rest of the project until

2004.

While the (M) was switched over to the West End where it remained until June 2009.

The (N) did run express in Brooklyn on weekdays from 1994 onwards, but ran express only during rush hours in May-November 1995 to allow the (B) shuttle to terminate at Pacific. It ran express in Brooklyn 24/7 from September 2002 to February 2004 when it ran as a Shuttle from Pacific to 86th Streets weekends and 36th to 86th late nights. It began running express all times except nights once all four Manhattan Bridge tracks were back in service.

Link to comment
Share on other sites

Also, the (Mx) was affected with a number of service changes. If memory serves me right, it was switched from the Brighton line to 95th Street via 4th Avenue local.

 

Then the (Mx) was truncated to 36th Street as the 4th Avenue express and the (N) became a 4th Avenue local. Shortly after, the (Mx) was extended to 9th Avenue during non-rush hours and extended further to Bay Parkway. In 1995, the (Mx) became a 4th Avenue local again and the (N) became an express once again.

 

Eventually, the (Mx) was truncated to Chambers Street and extended to Bay Parkway during rush hours and that service was maintained until last June when it became the 6th Avenue (M).

 

Considering that the(M) was not directly affected by the Manhattan Bridge reconstruction project, it certainly saw massive route changes since the project began,

Link to comment
Share on other sites

Guest lance25
A little off topic but what exactly were they doing on the (7) that knocked out express service?

 

Rehabbing the express tracks.

 

Also, the (Mx) was affected with a number of service changes. If memory serves me right, it was switched from the Brighton line to 95th Street via 4th Avenue local.

 

Then the (Mx) was truncated to 36th Street as the 4th Avenue express and the (N) became a 4th Avenue local. Shortly after, the (Mx) was extended to 9th Avenue during non-rush hours and extended further to Bay Parkway. In 1995, the (Mx) became a 4th Avenue local again and the (N) became an express once again.

 

Eventually, the (Mx) was truncated to Chambers Street and extended to Bay Parkway during rush hours and that service was maintained until last June when it became the 6th Avenue (M).

 

Considering that the(M) was not directly affected by the Manhattan Bridge reconstruction project, it certainly saw massive route changes since the project began,

 

The (Mx) line's changes were affected by the Brighton rehabs of the '80s. If they didn't need to fix the tracks and platforms along the Brighton line, the (Mx) might have died there.

Link to comment
Share on other sites

(:P - Shuttle between Pacific and Stillwell

 

(D) - 205th to 34th Street, same as 1986-88 and 2001-04

 

(Q6Av) - Replaced by (Q) which ran local in Brooklyn from Stillwell, via the Montague Tunnel, local from Whitehall to Canal and express from Canal to 57th Street. Used the Broadway connecting tracks north of 57th Street to get to 21st Street-Queensbridge.

 

Grand Street was served by a (S6) train to Broadway-Lafayette, same as 1986-88 and 2001-04.

 

So there was briefly a (Q) in the 90s? Via Whitehall? Interesting.

*cue theme to The More You Know*

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.