Brighton Express Posted November 11, 2012 Share #1026 Posted November 11, 2012 Makes sense now that you think about it. 0 Quote Link to comment Share on other sites More sharing options...
m7train Posted November 13, 2012 Share #1027 Posted November 13, 2012 who ever needs textures, send me a PM of what exactly you need. I have a solid amount left over from my MSTS projects, but it might not be relevant. 0 Quote Link to comment Share on other sites More sharing options...
Jamaica Local Posted November 14, 2012 Share #1028 Posted November 14, 2012 (edited) (It's GE&P testing an old username--ignore this post!) Edited November 14, 2012 by Jamaica Local 1 Quote Link to comment Share on other sites More sharing options...
GreeneggsnPelham Posted November 14, 2012 Share #1029 Posted November 14, 2012 Hey Guys, I'm FINALLY BACK!!!!!!!!!!!!!!!! -A 6 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 14, 2012 Author Share #1030 Posted November 14, 2012 nic to have you back and dont worry i kept them updated on your progress. 0 Quote Link to comment Share on other sites More sharing options...
GreeneggsnPelham Posted November 14, 2012 Share #1031 Posted November 14, 2012 Adding some terminal pieces to the subway set... Enjoy the WIP eye-candy gentlemen.... Still to be done: 2T Island Terminal 3T Island Terminal (Main St ) 4T Island Terminal (IRT Atlantic/Penn Sta) 4T Island Terminal (normal 2 island layout) The last two are inspired by Magicland's original SCS; he had a 4T terminal like Atlantic Av on the IRT. I figured that even though the 1T, 2T Island, and 4T's don't exist in the subway, they'll be wonderful additions for those doing fictional routes. For 6T terminals, you'll have to use various subway pieces that I've released and/or kitbash from built-in items and those found on the DLS. Enjoy! -A P.S. In anticipation to this question: Yes, I will try my best to have those exit signs editable for multiple lines of text, which is why they're currently blank. 2 Quote Link to comment Share on other sites More sharing options...
Threxx Posted November 14, 2012 Share #1032 Posted November 14, 2012 Welcome back, Ace. Great work on the objects! 0 Quote Link to comment Share on other sites More sharing options...
Brighton Express Posted November 15, 2012 Share #1033 Posted November 15, 2012 I like all the additions to the set green, keep up the good work. I will try to get on AIM sometime so we can talk about it. 0 Quote Link to comment Share on other sites More sharing options...
GreeneggsnPelham Posted November 15, 2012 Share #1034 Posted November 15, 2012 (edited) I couldn't fall asleep tonight without handing out MORE gifts, now could I??? And a bonus WIP (not sure about a release yet, it's too early to tell) Only one not included is the 1T because I'm tired, lol. You'll get it tomorrow gents! Enjoy! -A P.S. Due to attachment point problems and the general f**kery of 3DS max, the 3T splines/ends/terminal will only have the outer two tracks with attachment points. You'll have to place the middle track manually because the attachment points for the object-spline connector and the track itself are too close together to fix, and if I shifted the entire 3T model, I'd have to shift over the ENTIRE tunnel and station set, which is too much work. P.P.S. I know the LCD on the R32-C sucks guys--still working on those, Edited November 15, 2012 by GreeneggsnPelham 1 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 15, 2012 Author Share #1035 Posted November 15, 2012 Hey my entrances would look nice in those stations 0 Quote Link to comment Share on other sites More sharing options...
Brighton Express Posted November 16, 2012 Share #1036 Posted November 16, 2012 Only Green lol. 0 Quote Link to comment Share on other sites More sharing options...
GreeneggsnPelham Posted November 16, 2012 Share #1037 Posted November 16, 2012 (edited) Brighton Express: I never said I was completely finished handing out delicious eye candy-- 4T "Penn Station" Terminal- Multiple-lane surface tracks. I replaced old outdated ones I had used on the Dyre line previously. They come in the same variations, just two different ballast colors. And a small update for you guys project wise--I am rebuilding the Brighton-line stations that I was working on previously. The Prospect Park, Church, Cortelyou & Newkirk Plaza stations will stay the same because they employed the current "start object-spline-end object" building scheme we're currently using for the subway kit. However, the local stations south of there (Avs H, J, M, & Neck Rd), and express stations (Kings Hwy, Sheepshead Bay, Brighton Beach) will need their stations rebuilt to match the standards of the others. The Southern BMT is still several months away, but I'm currently cleaning house on obsolete items on my computer [not throwing them away, simply quarantining them to prevent mix-ups] and wherever I can reconstruct old items to fit current standards, I will. The signals & signs will be getting a modest makeover to fit these new tunnels! Lots of work before the Thanksgiving holidays, so hopefully something can be released to you all before next Friday so you can enjoy the long weekend a little more! -A Edited November 16, 2012 by GreeneggsnPelham 0 Quote Link to comment Share on other sites More sharing options...
Brighton Express Posted November 16, 2012 Share #1038 Posted November 16, 2012 (edited) Can't get better than this. Splendid work once again Green. Edited November 16, 2012 by Brighton Express 0 Quote Link to comment Share on other sites More sharing options...
GreeneggsnPelham Posted November 16, 2012 Share #1039 Posted November 16, 2012 Trust me Brighton--it can and will get better. This my solo work so far this week--but when B and I hook up on projects and put our minds together---mind blowing stuff comes out of those long meetings! -A 1 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 17, 2012 Author Share #1040 Posted November 17, 2012 Hey i was wondering are you only making the station exits only for the terminal pieces or can you make for other splines to? 0 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 17, 2012 Author Share #1041 Posted November 17, 2012 like this 0 Quote Link to comment Share on other sites More sharing options...
GreeneggsnPelham Posted November 17, 2012 Share #1042 Posted November 17, 2012 For now, just for the terminal pieces. B and I have a deadline to meet for release and it looks like there is A LOT of work to still be done. So, please be patient. The subway tunnel and station kit is our first priority. Any add-ons will have to wait. -A 0 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 17, 2012 Author Share #1043 Posted November 17, 2012 ok srry if i sounded like a gimme pig there. 0 Quote Link to comment Share on other sites More sharing options...
Bstyles Posted November 17, 2012 Share #1044 Posted November 17, 2012 You can easily get the job done with the basic station and tunnel pack, which will include platform amenities like stairs, trash cans, subway maps, benches, and other things of that nature. Terminal pieces are a priority, so once the work has concluded on this first set we will come back to this after the completion of the open cut and elevated work. 0 Quote Link to comment Share on other sites More sharing options...
Brighton Express Posted November 17, 2012 Share #1045 Posted November 17, 2012 Sounds good to know B. I am really excited for the opencut, really need it for my route. 0 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 18, 2012 Author Share #1046 Posted November 18, 2012 How bout this guys just a prototype 0 Quote Link to comment Share on other sites More sharing options...
GreeneggsnPelham Posted November 18, 2012 Share #1047 Posted November 18, 2012 Is that yours or from the 3D Model Warehouse? 0 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 18, 2012 Author Share #1048 Posted November 18, 2012 It's from the Warehouse 0 Quote Link to comment Share on other sites More sharing options...
Brighton Express Posted November 18, 2012 Share #1049 Posted November 18, 2012 train you should say it is not yours if you are posting it. Please try to post your own content. 0 Quote Link to comment Share on other sites More sharing options...
Strain Posted November 18, 2012 Author Share #1050 Posted November 18, 2012 No the pic is my but i exported this from the Warehouse i told you guys that i was working on station entrances. 0 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.