Jump to content

Unplanned Subway Service Changes


Guest lance25

Recommended Posts

Alright, everyone chill out. Wallyhorse, if you have a proposal, please take it to the proposals thread.

I was simply responding to the (B) emergency this past week and how THAT can be averted at first.  My bad for not moving it to the Proposals Thread, which I have now done
 

NOBODY can use the Montague-Nassau connection. It's gone and it probably won't be coming back. Keep dreaming. And get that fantasy crap out of this thread.

 

I explained why in the Proposals/Ideas thread.

Link to comment
Share on other sites


  • Replies 8.2k
  • Created
  • Last Reply

NOBODY can use the Montague-Nassau connection. It's gone and it probably won't be coming back. Keep dreaming. And get that fantasy crap out of this thread.

It's not like they filled it in or something or built something in its way. They didn't complete the Sandy work (like they did ont he main tunnel), and have apparently put it off for some reason, but they should get to it eventually.

Link to comment
Share on other sites

It's not like they filled it in or something or built something in its way. They didn't complete the Sandy work (like they did ont he main tunnel), and have apparently put it off for some reason, but they should get to it eventually.

You would think the mess last week would be a good reason to finish that work.

Link to comment
Share on other sites

That's why I do it in three phases or even four with the Manhattan stations first. The Manhattan stations being 600' allow for re-routes of trans from the 4th Avenue and Brighton lines when needed via the tunnel via Nassau and a re-connection of the Nassau Line to the Manny B (Brooklyn-bound side ONLY) for sending back over the Bridge via Nassau when needed (either via emergencies or G.O.'s) as well as G.O.'s that require 6th Avenue trains to use the tunnel and changing directions at Essex.

 

It's been noted before many of those stations used to handle eight 67' cars, so in all likelihood, albeit a tight fit those stations likely could handle nine 60' cars with if necessary minimal additional footage added (meaning you could link a five-car set of R160s with a four-car set of R-160s and run such as nine-car trains) as it is.

 

Main purpose at first is as noted with eventually the plan being all stations being 600 feet.

 

 

Note you're creating another problem...

 

ENY has no 5 car 160s. They would have to be borrowed from other places, now leaving them short on cars themselves. So now everyone gonna be running 9 car trains (including trains originally 10 cars) for no reason whatever

 

Seriously, you overthink these things sometimes

Edited by Fresh Pond
Link to comment
Share on other sites

Note you're creating another problem...

 

ENY has no 5 car 160s. They would have to be borrowed from other places, now leaving them short on cars themselves. So now everyone gonna be running 9 car trains (including trains originally 10 cars) for no reason whatever

 

Seriously, you overthink these things sometimes

We can always get "C" cars ala R142A/R188 lmao duck.gif

Link to comment
Share on other sites

It's not like they filled it in or something or built something in its way. They didn't complete the Sandy work (like they did ont he main tunnel), and have apparently put it off for some reason, but they should get to it eventually.

Fixing the Nassau connection is about 9998 on the list of things that need to be done, especially now that no revenue service uses that tunnel. Unless an extra billion dollars magically appears in the budget, it will continue to sit OOS indefinitely.

Link to comment
Share on other sites

It would be part of a long-term plan to extend ALL of the stations on the Broadway-Brooklyn line in multiple phases:

 

Phase 1 would be the Nassau Street Line stations plus those in Brooklyn that serve the (M).  This would allow the (M) to be 10 cars once that is complete.  It would also include reconnecting the Nassau Street Line tracks to the Manhattan Bridge going to Brooklyn ONLY.  That would allow for a loop line train that would have a single terminal in Bay Parkway, going via the tunnel to Manhattan and via the Bridge to Brooklyn (stopping at Jay Street and Court Street in Brooklyn and Broad, Fulton and Chambers Street in Manhattan going northbound ONLY before going back to Brooklyn over the bridge as well as allow for situations like what happened with the (B) so it can run via the tunnel and back over the Manny B after Chambers.  

 

Phase 2 would be the remaining stations between Myrtle Avenue and Broadway Junction on the Broadway-Brooklyn Line (these would be the stations after the (M) goes to Metropolitan.  This would allow for some 10-car short-turn (J) service between Broadway Junction and Manhattan and also allow for 6th or 8th Avenue trains (that are 60' cars) when needed to use the Broadway-Brooklyn line in a re-route, especially the (C) to Broadway Junction in the event that is needed.

 

Phase 3 would be the rest of the stations on the (J) between Broadway Junction and Jamaica Center so the (J) can have 10-car trains at all times and also allow in an emergency for the (E) or (J) run to/from Jamaica Center via QB, Manhattan and Broadway-Brooklyn both ways..

 

Wally can we please stay on topic.  There's a proposal topic for these kind of discussions.  Keep it there please.

 

Thank you for understanding.

Link to comment
Share on other sites

Fixing the Nassau connection is about 9998 on the list of things that need to be done, especially now that no revenue service uses that tunnel. Unless an extra billion dollars magically appears in the budget, it will continue to sit OOS indefinitely.

Contractors are currently working down there...

Link to comment
Share on other sites

Fixing the Nassau connection is about 9998 on the list of things that need to be done, especially now that no revenue service uses that tunnel. Unless an extra billion dollars magically appears in the budget, it will continue to sit OOS indefinitely.

Like what has to be done with it? The bulk of the work was in the main Montague tunnel, this was just a connecting branch. Billions, for real?

There's no revenue service, but nonrevenue moves have to go up to W4 and reverse, in the middle of thru IND traffic.

Link to comment
Share on other sites

Due to a train with mechanical problems at Queensboro Plaza, southbound n.png, q.png and Times Sq bound 7.png trains are running with delays. 

Allow additional travel time.

 

I'm confused. Which line has the problem train? I know that the (N)(Q) is going through fastrack. Possiblity the Astoria bound (N) is having problems. 

Link to comment
Share on other sites

Due to a train with mechanical problems at Queensboro Plaza, southbound n.png, q.png and Times Sq bound 7.png trains are running with delays. 

Allow additional travel time.

 

I'm confused. Which line has the problem train? I know that the (N)(Q) is going through fastrack. Possiblity the Astoria bound (N) is having problems. 

It was a Work Train

Link to comment
Share on other sites

Oh damn, 7th Avenue is a hot mess now (edit: it was resolved quickly):

 

Service Change  Posted: 07/14/2015 12:08PM 
 

Due to switch problems at 96 St, the following service changes are in effect:

Northbound 1.png trains are running express from Chambers St to 96 St.

There is no northbound 2.png train service from 96 St to Wakefield-241 St.

There is no northbound 3.png train service from to 96 St. to Harlem-148 St.

Some southbound 2.png trains are terminating at E 180 St or 149 St-Grand Concourse.

Northbound 2.png trains are running on the 5.png line from Nevins St to 149 St-Grand Concourse.

Some northbound 2.png and 3.png train service are terminating at 137 St or Van Cortlandt Park-242 St.

Customers are advised to use a.pngb.pngc.pngd.png train service or M5M7 or M20 bus making nearby stops.

Allow additional travel time.

Edited by paulrivera
Link to comment
Share on other sites

That building collpase on Fulton was pretty nasty. 

 

http://7online.com/news/3-injured-in-multi-story-building-collapse-in-brooklyn/850869/
 

Due to switch problems at Broadway Junctiona.png trains are running local between Broadway Junction and Utica Av in both directions.

Allow additional travel time.



Service Change  Posted: 07/14/2015  3:47PM



Due to a building collapse on Fulton St, the following service changes are in effect:

a.png trains are running with delays in both directions.

c.png trains are bypassing Kingston-Throop Avs in both directions.

As an alternative customers can take the B25 bus.

Allow additional travel time.

 

E

Edited by Joel Up Front
Link to comment
Share on other sites

That building collpase on Fulton was pretty nasty.

 

http://7online.com/news/3-injured-in-multi-story-building-collapse-in-brooklyn/850869/

 

Due to switch problems at Broadway Junction, a.png trains are running local between Broadway Junction and Utica Av in both directions.

Allow additional travel time.

 

 

Service Change Posted: 07/14/2015 3:47PM

 

 

Due to a building collapse on Fulton St, the following service changes are in effect:

a.png trains are running with delays in both directions.

c.png trains are bypassing Kingston-Throop Avs in both directions.

As an alternative customers can take the B25 bus.

Allow additional travel time.

 

E

Building collapsed outside. The street had to be evacuated

Link to comment
Share on other sites

Service Change  Posted: 07/14/2015 10:03PM
Due to track maintenance at 5 Av-59 St, the following service changes are in effect:

n.png, q.png and r.png trains are running with delays in both directions.

Some northbound r.png trains are running on the f.png line from 57 St-7 Av to 36 St (QNS).

Allow additional travel time.

 

Should it be removed since it fasttrack period right now. 

Link to comment
Share on other sites

Service Change  Posted: 07/15/2015  2:21PM 
 

Due to a train with mechanical problems at Jackson Heights-Roosevelt Av, southbound e.png and f.png trains are running local from Forest Hills-71 Av to Jackson Heights-Roosevelt Av.

Allow additional travel time.

 

Why don't they send the (E) and (F) Express on the Local? Hold the local at 71st and let the (E) & (F) go first?

Link to comment
Share on other sites

Service Change  Posted: 07/15/2015  2:21PM 

 

Due to a train with mechanical problems at Jackson Heights-Roosevelt Av, southbound e.png and f.png trains are running local from Forest Hills-71 Av to Jackson Heights-Roosevelt Av.

Allow additional travel time.

 

Why don't they send the (E) and (F) Express on the Local? Hold the local at 71st and let the (E) & (F) go first?

Not with 20+ trains per hour on one track. That's a train every two minutes or less, which is basically max capacity.

Link to comment
Share on other sites

Service Change  Posted: 07/15/2015  5:15PM
Due to signal problems at 5 Av-59 St, the following service changes are in effect:

Southbound n.png, q.png and r.png trains are running with delays.

Some southbound r.png trains are running on the f.png line from 36 St (QNS) to 57 St-7Av.

Allow additional travel time.

 

I hope that they won't cut the (N)(Q) service to/from Astoria. They tend to do it. 

Link to comment
Share on other sites

Service Change  Posted: 07/15/2015  5:45PM 
 

Due to signal problems at Avenue H, northbound b.png trains are running local from Kings Hwy to Prospect Park.

 

Allow additional travel time.


I hope that they won't cut the (N)(Q) service to/from Astoria. They tend to do it. 

 

Yeah, it helps to re-route the (R) over the 63rd than to reduce (N)(Q) service to/from Astoria.

Link to comment
Share on other sites

Service Change  Posted: 07/15/2015  6:48PM 
 

Due to an NYPD investigation of customer injury at 59 St, southbound 6.png trains are running express from 125 St to Grand Central-42 St.

 

Expect delays on southbound 4.png5.png and 6.png train service.

 

Allow additional travel time.

 

Service Change  Posted: 07/15/2015  7:21PM 
 

Due to switch problems at Bay Ridge-95 St, southbound r.png trains terminate at 86 St (BKLYN).

 

As an alternative customers can take the B16B37 or B63.

 

Allow additional travel time.



Service Change  Posted: 07/15/2015  7:08PM 
 

Due to a train with mechanical problems at 28 St, northbound n.png and r.png trains are running express from Canal St to 34 St-Herald Sq.

 

Expect delays on the q.png.

 

Allow additional travel time.

Link to comment
Share on other sites

Service Change Posted: 07/15/2015 6:48PM

Due to an NYPD investigation of customer injury at 59 St, southbound 6.png trains are running express from 125 St to Grand Central-42 St.

Expect delays on southbound 4.png, 5.png and 6.png train service.

Allow additional travel time.

Service Change Posted: 07/15/2015 7:21PM

Due to switch problems at Bay Ridge-95 St, southbound r.png trains terminate at 86 St (BKLYN).

As an alternative customers can take the B16, B37 or B63.

Allow additional travel time.

 

 

Service Change Posted: 07/15/2015 7:08PM

Due to a train with mechanical problems at 28 St, northbound n.png and r.png trains are running express from Canal St to 34 St-Herald Sq.

Expect delays on the q.png.

Allow additional travel time.

I'm wonder how things are going to be like when the (W) returns
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.